opening in the south transept formed and ready for connection with the link building
link building concrete frame formed and steps in place
internal steps in place leading from the reception to the link building
south aisle mezzanine – home of the future seminar room – with services being installed below.
The location of the ladder roughly equates to the future location of the spiral staircase.
balcony of the north aisle mezzanine in place, overlooking the future refreshments area
the services have now been laid below the floor level, overlaid with underfloor heating and the floor is now being finished